Along with the following, we offer many more high-quality products to fit your needs and price range. If you would like to discuss construction standards and upgrades, please contact us at any time.
| 1. Your Lot Must Be Surveyed & the House Staked out on the Lot |
| 2. All Building & Any Needed Sanitary Permits Must Be Obtained |
| 3. Topsoil Should Be Stripped & Stockpiled (Some Subdivisions Have Already Removed the Top Soil) |
| 4. Excavation Begins & the Basement Is Dug (This Is When You Should Get Excited) |
| 5. Masonry Work Begins by Pouring the Footings for Your Foundation, After Your Footings Are Set, the Walls Will Start to Go up |
| 6. After the Mason Has Completed His Work, the Excavator Will Come Back & Back Fill the Foundation |
| 7. Lumber Will Be Delivered & the Carpenters Go to Work Framing Your House, Putting up Roof Trusses, Installing Windows |
| 8. After Rough Carpentry Is Completed, the Roofing Shingles & Gutters Will Be Installed |
| 9. Plumber, Heating Contractor & Electrician Will Run Rough Wiring, Heat Ducts & Plumbing in All Walls |
| 10. Walls Will Be Insulated & Vapor Barrier Installed |
| 11. Drywall Will Be Hung, Taped, Finished & Sprayed |
| 12. Hardwood Flooring & Tile Work Begins |
| 13. Finish Carpenter Will Start Installing Interior Doors, Millwork, Cabinets & Installing All Hardware |
| 14. Plumber Returns to Finish Plumbing, Install Fixtures, Etc. |
| 15. Heating Contractor Returns to Install Furnace & Finish Heating Work & Air Conditioning |
| 16. Electrician Returns to Install Light Fixtures & All Finish Wiring |
| 17. Painters Will Start Finishing All Woodwork, Painting Walls & Ceilings |
| 18. Carpeting & Vinyl Floors Will Be Installed |
| 19. Final Cleanup & Any Touch-up Work |
| 20. Moving Day |
Our building standards are often considered extras or upgrades with other builders. They include:
| 2×6 Exterior House Walls |
| OSB Plywood Wall Sheeting with Tyvek™ Brand House Wrap the Entire House & Garage |
| TJI Floor Joist System or Douglas Fir Floor Joist |
| Two-Part Floor System, Glued & Nailed for Silent Floors (Many Others Cut Costs by Only Using a One-Part Floor System) |
| Block or Poured Foundation (Depending on the Best Fit for the Project) |
| Insulated & Waterproofed Foundation Walls with a Heavy Fiber Reinforced Tar from Footing up Top of Wall or Grade (Optional Tuff-N-Dri™ Waterproofing System) |
| Steel I-Beam Main Supporting System (Not Wood) |
| Real Stone or Brick on Exteriors |
| 30-Year Dimensional Roofing |
| Solid Hardwood Flooring |
| Natural Fireplace with Gas Lighter |
| R-21 Insulation in the Walls & R50 Blown Fiberglass in the Attic |
| Soundproofing Insulation around All Bathrooms & Master Bedrooms |
| High-Grade Cedar Siding or Hardie Plank Siding™ (Depending on Price Range & Preference) |
| Steel Insulated Garage Doors with Inner Steel Panels |
| Kohler™ Water Closets & Fixtures |
| Kohler™ Faucets |
| Kohler™ or Lasco™ Tub & Shower Modules |
| Laundry Vanity with Mustee™ Tub |
| Gas & Electric Appliance Hookups |
| Minimum of 200 Ampere Electric Service |
| Wiring for Cable TV, & CAT 5 Phone & Data Lines |
| Carrier High Efficiency Furnace with Multiple Zones for Added Comfort & Efficiency |
| Carrier MX™ Series Air Conditioning |
| Shower Door & Mirror Allowance |
| Aluminum Low E Clad Casements or Double Hung Windows |