1. Your Lot Must Be Surveyed & the House Staked out on the Lot
2. All Building & Any Needed Sanitary Permits Must Be Obtained
3. Topsoil Should Be Stripped & Stockpiled (Some Subdivisions Have Already Removed the Top Soil)
4. Excavation Begins & the Basement Is Dug (This Is When You Should Get Excited)
5. Masonry Work Begins by Pouring the Footings for Your Foundation, After Your Footings Are Set, the Walls Will Start to Go up
6. After the Mason Has Completed His Work, the Excavator Will Come Back & Back Fill the Foundation
7. Lumber Will Be Delivered & the Carpenters Go to Work Framing Your House, Putting up Roof Trusses, Installing Windows
8. After Rough Carpentry Is Completed, the Roofing Shingles & Gutters Will Be Installed
9. Plumber, Heating Contractor & Electrician Will Run Rough Wiring, Heat Ducts & Plumbing in All Walls
10. Walls Will Be Insulated & Vapor Barrier Installed
11. Drywall Will Be Hung, Taped, Finished & Sprayed
12. Hardwood Flooring & Tile Work Begins
13. Finish Carpenter Will Start Installing Interior Doors, Millwork, Cabinets & Installing All Hardware
14. Plumber Returns to Finish Plumbing, Install Fixtures, Etc.
15. Heating Contractor Returns to Install Furnace & Finish Heating Work & Air Conditioning
16. Electrician Returns to Install Light Fixtures & All Finish Wiring
17. Painters Will Start Finishing All Woodwork, Painting Walls & Ceilings
18. Carpeting & Vinyl Floors Will Be Installed
19. Final Cleanup & Any Touch-up Work
20. Moving Day

Our building standards are often considered extras or upgrades with other builders. They include:

2×6 Exterior House Walls
OSB Plywood Wall Sheeting with Tyvek™ Brand House Wrap the Entire House & Garage
TJI Floor Joist System or Douglas Fir Floor Joist
Two-Part Floor System, Glued & Nailed for Silent Floors (Many Others Cut Costs by Only Using a One-Part Floor System)
Block or Poured Foundation (Depending on the Best Fit for the Project)
Insulated & Waterproofed Foundation Walls with a Heavy Fiber Reinforced Tar from Footing up Top of Wall or Grade (Optional Tuff-N-Dri™ Waterproofing System)
Steel I-Beam Main Supporting System (Not Wood)
Real Stone or Brick on Exteriors
30-Year Dimensional Roofing
Solid Hardwood Flooring
Natural Fireplace with Gas Lighter
R-21 Insulation in the Walls & R50 Blown Fiberglass in the Attic
Soundproofing Insulation around All Bathrooms & Master Bedrooms
High-Grade Cedar Siding or Hardie Plank Siding™ (Depending on Price Range & Preference)
Steel Insulated Garage Doors with Inner Steel Panels
Kohler™ Water Closets & Fixtures
Kohler Faucets
Kohler or Lasco™ Tub & Shower Modules
Laundry Vanity with Mustee™ Tub
Gas & Electric Appliance Hookups
Minimum of 200 Ampere Electric Service
Wiring for Cable TV, & CAT 5 Phone & Data Lines
Carrier High Efficiency Furnace with Multiple Zones for Added Comfort & Efficiency
Carrier MX™ Series Air Conditioning
Shower Door & Mirror Allowance
Aluminum Low E Clad Casements or Double Hung Windows